EV Charger Installation in Naples, FL

Level 2 home charging for Collier County — every brand, permits included, firm pricing up front.

EVs are everywhere in Naples — and most of them are charging off a regular wall outlet at 4 miles of range an hour. A Level 2 charger fills the battery overnight. We install them across Collier County: Pelican Bay, Park Shore, Vanderbilt Beach, Pine Ridge, the Vineyards, and everywhere in between.

Level 2 Charging, Installed Right

  • Hardwired Level 2 chargers (Tesla, ChargePoint, Emporia, Wallbox, and more)
  • NEMA 14-50 outlets for plug-in chargers
  • Load calculations and panel capacity checks before we quote
  • Panel upgrades when the house needs more service
  • Collier County permits and inspection included

Naples Homes Have a Panel Question to Answer First

A Level 2 charger is one of the biggest loads you can add to a house. Naples homes already running two air conditioners, a pool pump, and an outdoor kitchen are sometimes closer to their panel’s limit than the owner realizes. We run the load calculation first. If there’s room, we wire the charger. If there isn’t, we’ll show you the honest options — a load-management device, a smaller circuit, or a panel upgrade.

What It Costs

Level 2 installation typically runs $450 to $1,500+ — the big variables are the distance from panel to garage and whether the run needs conduit. You’ll get a firm quoted price up front, not an hourly guess.

What Our Customers Say

“They were responsive and friendly during inquiry and scheduling. Rainier was the electrician that came to complete the service. He was also friendly, attentive to details, and completed all the work quickly. We will request Rainier when we call SWFL electric again and we would recommend them for anyone looking for an electrician in SWFL.” — Jack B., via Google

EV Charger Questions We Hear Most

How much does EV charger installation cost in Naples?
Most Level 2 installs run $450 to $1,500+ depending on panel capacity, the distance to your garage, and conduit work. Larger Naples homes with long garage runs tend to land mid-range. We quote a firm price before any work starts.

Do I need a permit to install an EV charger in Naples?
Yes — a hardwired Level 2 charger requires an electrical permit through Collier County (or the City of Naples inside city limits). We pull the permit and schedule the inspection as part of every install.

Can my panel handle a Level 2 charger?
Many newer Collier County homes have 200-amp service with plenty of room. Older panels — or homes already running two AC units and a pool — sometimes need a load-managed charger or a panel upgrade. We do the load calculation up front so there are no surprises.

Which EV charger brands do you install?
All of them — Tesla Wall Connector, ChargePoint, Emporia, Wallbox, JuiceBox, and the charger that came with your car. If you haven’t bought one yet, we’ll recommend a unit that fits your vehicle and panel.

How long does the install take?
Most installs are done in a single visit of two to four hours. Panel upgrades add a second visit for the utility and inspection coordination.

Tesla owner? See our dedicated Tesla charger installation page. For everything else electrical in Collier County, start with our Naples electrician page or the full EV charging station service page.

Ready to get started? Call 239-372-9426 or send a request through our contact page. Licensed & insured — FL License EC13004490. Family-owned and serving Southwest Florida since 2010.

Want us to catch problems like this early? Our Home Maintenance Plan covers a yearly inspection.

Southwest Florida Electric Inc. Home Maintenance Plan

Keep your panel in good shape

Our Home Maintenance Plan includes a yearly inspection.

$19.95
a month
  • Yearly electrical inspection
  • Priority service
  • Member perks
  • Extended warranty on installs and repairs

See the Plan